The plain-language guide
What is a project specific health and safety plan?
It is the document that shows the City how your company will keep workers and the public safe on one project. It names the people responsible, the hazards of each task and how they are controlled, the training your crew holds, how incidents are reported, and what happens in an emergency. On a City of Calgary contract it is written on the City's 12-section form and approved before you get site access.
Who is the prime contractor for safety on a City of Calgary project?
Under the City's 2026 Standard General Conditions, the contractor takes on the Prime Contractor for Safety role for the entire project site, unless the contract's special conditions say the City keeps it. You confirm it in writing on the City's prime contractor acknowledgment form before work starts. Only the prime contractor has to be prequalified; subcontractors work under its plan.
What are the City of Calgary X711 and X712 forms?
X711 is the Notice of Acknowledgement of Prime Contractor for Safety Designation. X712 is the Project Emergency Contacts form, completed and posted on site. Both sit alongside the X659 plan, and we complete them as part of the package.
What happens if the City rejects your safety plan?
Work does not start. The City's safety advisor returns the review with each item marked pass or fail, and you resubmit a revised plan. We rewrite the failed sections and add a one-page response that shows the reviewer exactly where each item is now answered, which is what gets a resubmission through quickly.
Does the City need to see your safety orientation?
Yes. The Standard General Conditions ask for a written orientation agenda to go to the City for review before the meeting. We write the agenda and the orientation record to match the hazards in your plan.
When do hazard assessments go to the City?
With the plan, before the project starts. The City's plan form asks for hazard assessments to go to the City project manager for review before work begins. We write one activity hazard assessment for each task, with every hazard rated and engineering, administrative and PPE controls written as actions.
How is a City safety plan different from a company safety manual?
Your safety manual covers your whole company. A project safety plan covers one project: this site, this crew, these tasks, this traffic and public exposure, these emergency contacts and hospitals. The plan points back to your manual for company-wide policies, so a clear manual makes the plan shorter and stronger.
What does a City reviewer expect for silica?
Any task that grinds, cuts or crushes concrete, asphalt or aggregate creates respirable crystalline silica. Reviewers look for an exposure control plan by task, wet methods or extraction, a respirator program with fit testing, and how dust and slurry are kept away from the public.
Does custom or modified equipment need an engineer?
City reviewers can ask for a professional engineer's assessment of equipment that has been built or modified for the job, such as a custom attachment. We flag that equipment early and attach the assessment, with its conditions carried into the hazard assessments and procedures.